Trivières crèche, built to passive standards

The complex involves two inter-linked buildings:

  • The first, about the size of a house, contains the lobby and amenities;
  • The second, designed more individually and resting on piles, is for the children.

The footprint of the first building is very limited, while the set of buildings on piles allows nature to freely "reclaim" the ground around the buildings, as on the whole plot.

The building is a certain height above the ground, taking account of the contours of the plot which rises somewhat on the south side.

Constructor(s): 
DE GRAEVE
Developer: 
Administration Communale de La Louvière
Architect: 
SC SPRL CARNOY-CRAYON, Mr Damien CARNOY
Project duration: 
12/04/2010 - 28/02/2011